Installation of Rough Sawn "U" or Shaped Beams/Headers
                      

       Interior ëUí Beams:
      ®      Start with a clean dry-walled ceiling, mark your beam position on the ceiling and pre-drill 16î on
            center two 2î x 2î wood furring strips. 

®      Apply Nesco recommended adhesive (Polyurethane Sealant #6000 by Silicones Unlimited available at Nesco; ChemRex #948 by ChemRex, Inc.; Vulkem #116 by Tremco; PL Premium Construction Adhesive, PL #200 OR PL Polyurethane Sealant available at Loweís & Home Depot) to back of 2î x 2î and screw into ceiling--one-length of 2î x 2î per side spaced inside the Nesco beam dimension.  (See detail)

®      Measure beam and cut to fit ‡î longer than actual dimension

®      Dry fit beam in place

®      Pull beam back down and adhesive the sides of the 2î x 2î 

®      Reinstall beam and fasten with 2î screws into the sides of the 2î x 2î 

®      Bondo and finish holes


                                                  

To Contact Us:

Phone:  480.756.6675
Fax:  480.756.6679
Sales@Nescomfg.com

Nesco Manufacturing, Inc.
1510 West Drake Tempe, AZ  85283


Nesco Manufacturing, Inc. website designed and maintained by Site Solutions.
Email our webmaster with any questions or comments regarding this site.
Mail To:  webmaster@sitesolutions.nu
copyright
© 1999-2007 - All rights reserved